Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

January 31, 2024

January 31, 2025

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

To Be Determined, Corvallis, OR

Subscribe to View Full Documents

Consultant will design a fire-testing laboratory at Oregon State University's Corvallis campus. A custom-built structure will be erected, adjacent to the A.A. Emmerson Advanced Wood Products Laboratory, to house the furnace and associated equipment. The furnace chamber will be of approximate dimensions 8’L x 4’H x 4’D, with electronic temperature and pressure control systems, a suite of measuring devices, data acquisition and management systems and related software, a dust collection system and a scrubber/filtration system. The furnace will employ natural gas as fuel and can be used to perform fire resistance tests on vertical or horizontal wall specimens, beam-column shear connections and short columns. The chamber complies with various international standards for fire testing, including the ASTM-E119 test for walls, partitions and floor or roof systems, used in the US. The structure will be fire-protected and sprinklered and will allow forklift access via wide front-opening double doors, with additional material handling capabilities enabled via an integrated five-ton crane. Scope of services will include regular site visits, in-person and/or virtual meetings to interview day stakeholders, test fit, land use/code review, schematic design, design development, construction documents, permitting processing and management support, cost estimating services, bidding/negotiating support and construction administration. The proposing firm is free to subcontract as necessary to ensure a complete design team. As of August 4, 2023, per owner, the design team has been identified. Construction is tentatively set to begin in 2024 with completion in 2024 or 2025.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.