Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 16, 2026

June 19, 2023

No Information to Display

10 Post St

Renovation, Site Work

No Information to Display

$100,000.00

Public - City

img_map_placeholder

10 Post St, Yonkers, NY

Subscribe to View Full Documents

Reference Number 0000317222 location - 10 and 16 POST STREET YONKERS, NEW YORK 10701 Question Deadline 05/08/2023 at 10:00 AM ET Questions are submitted online No Unity Park and Playground Improvements Contact Information Kim Sansevere 914-377-6036 kimberly.sansevere@yonkersny.gov General Requirements - Certified Payroll - Contractors License Required - FOB Destination - Installation Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % Remove all existing improvements unless otherwise noted. Fill below-ground improvements designated to be abandoned and protect existing vegetation designated to remain and clean out all drain inlets. All items to be removed include but are not limited to: 1. Play Structures. 2. Rubber Surfacing 3. Under-Pavement/Stone Removal and Abandonment of Improvements 1. Remove all existing above and below grade improvements, unless they are designated to remain or be abandoned. 2. Remove portions of improvements to remain where necessary to facilitate new construction. 3. Clean out, disinfect, and fill any existing wells, cesspools, or privy vaults designated to be abandoned. 1. Remove and dispose of existing playground equipment and safety surfacing. 2. Install new playground equipment, rubber safety surfacing, and base material. 3. Install drainage as required.

56 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.