Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

September 15, 2023

October 1, 2024

1010 Dewey Ave

Site Work

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

1010 Dewey Ave, West Rutland, VT

Our team is requesting plans for this project.

Subscribe to View Full Documents

Work tasks will generally involve removal of the earthen embankment (15,600 CY) and concrete spillway (450 CY) at Youngs Brook Dam; removal of existing trees from the embankment; sediment removal and haul from site (11,000 CY); removal of upstream stone masonry wall; stream channel restoration using onsite logs and boulders; and site restoration. The owner of the project is the Town of West Rutland and engineering oversight of the project will be conducted by Town’s appointed Project Engineer – SLR Consulting. The Contractor will be obligated to comply with directives from the Project Engineer to ensure meeting all contract provisions and design specifications while complying with permit requirements. The Contractor will be obligated to adhere to the Terms and Conditions in the Contract with the owner. Project construction is anticipated between September 15, 2023 and October 1, 2024. Questions about the bid will be accepted until 5:00 pm on Friday September 1, 2023. Final responses to questions will be issued in a final addendum by 5:00 pm Monday September 4, 2023. Liability and Property Damage Insurance. Unless otherwise specified, each policy shall have limits not less than: $2,000,000 combined (Bodily Injury and Property Damage); $3,000,000 aggregate, single limit per occurrence. The Town reserves the right to reject any or all bids on its own motion. The Town reserves the right to conduct value engineering with the lowest and most qualified bidder.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.