Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

October 23, 2023

March 21, 2024

To Be Determined

Site Work

No Information to Display

$1,300,000.00

Public - City

img_map_placeholder

To Be Determined, Elizabethton, TN

Subscribe to View Full Documents

Est. Value: $ 1.30 Est. Value Notes: 1.3 Million The work to bid on is as follows: Installation of approximately 2,600 linear feet of 12-inch restrained joint ductile iron pipe (a parallel installation) by open-cut method and installation of a proposed pipe hangar system on the existing State Route 37 bridge over the Doe River in the Valley Forge community. Also, included in the work is the installation of several gate and butterfly valves, fire hydrant, connections to existing 8-inch, 12-inch, and 16-inch CIP lines along State Route 37, Riverview Drive, and Howard Lipford Drive. The allotted time for construction is 180 calendar days. All Bids must be submitted with documents prepared by McGill Associates, P.A. Bidders are encouraged to only secure project Bidding Documents as noted above. Neither the Owner nor the Engineer will be responsible for full or partial sets of Bidding Documents, including any Addenda, obtained from any source other than the Engineer and their representative plan provider, Quest CDN. Each Bidder shall be responsible for the review of all addenda for the project and shall acknowledge the addenda on the bid form. : The MBE fair-share goal is 2.6% for construction and 5.2% for supplies, services, and equipment. The WBE fair share goal is 2.6% for construction and 5.2% for supplies, services, and equipment

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.