Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 26, 2023

January 16, 2024

1177 Main St

Renovation, Site Work

No Information to Display

$68,000.00

Public - City

img_map_placeholder

1177 Main St, Crete, IL

Subscribe to View Full Documents

Site Directions: 1177 Main Street, Crete, IL P.I.N. # 23-15-09-103-005-0000 Construction, Concrete/Formed/Flatwork/Foundation, Buildings and Grounds/Athletic/Sports Facilities, Parks, Recreation, Buildings & Facilities The proposed work is officially known as Crete Public Library; Outdoor Pavilion And Raised Sensory Garden Area. Work includes the following: o Supply and construct an approximate 35' x 35' Timber Pavilion Structure as shown on the Plan. o Prepare and place concrete and aggregate base floors, including positive drainage details as shown on the Plan. o Supply and construct several raised garden areas as shown on the Plan. o Locate the proper circuit in the Library and extend electrical service to the Pavilion then supply and install several outlets and fixtures. o Locate the proper water pipe on the north side of the library and extend water service and spigot to the Garden Area. o Build other enhancements to make the improvement more aesthetically pleasing. o Any additional appurtenant work required to make this a well-constructed project, and all required safety measures and clean-up tasks to insure a successful project. o The Contractor will work in a deliberate and safe manner. The safety of the Public, and the CPL Staff and the Contractor's Employees is the TOP PRIORITY. o The Contractor will work in a neat fashion and ensure a clean work environment. The Contractor will properly clean and dispose of all work debris and neatly store all tools at the end of each workday

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects