Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 1, 2023

October 2, 2023

January 29, 2026

Multiple Locations

New Construction, Renovation, Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

Multiple Locations, Anchorage, AK

Subscribe to View Full Documents

IAW DFAR 236.204(i), Disclosure of Magnitude of Construction Projects, the estimated price range of this between $10,000,000 and $25,000,000. Payment and Performance bonds shall be obtained IAW FAR 28.102. Requirement / Description Contractor shall provide all labor, materials, equipment, hardware, software and programming necessary to provide fully functional repairs for Tank Farms 3 and 4 as detailed in the attached Statement of Work (Attachment 1), drawings (Attachment 2), and specifications (Attachment 3). The purpose of this project is to consolidate the bulk JP-8 and Ultra-low Sulfur Diesel (ULSD) storage and issue capabilities of Fuel Farm #3 and Fuel Farm #4. The existing bulk storage Underground Storage Tank (USTs) at Fuel Farm #3 and #4 are of 1950s vintage and have reached the end of their service life. The Fuel Farm #3 and #4 aviation and bulk ULSD infrastructure will be demolished, along with the underground JP-8 transfer pipeline, and reconstructed as a consolidated system at the Fuel Farm #4 area. The consolidated facility will have six 50,000-gallon double-wall USTs for JP-8 storage and one 25,000-gallon double-wall UST for ULSD storage. A new filter building with control room and motor control center (MCC) will also be constructed at Fuel Farm #4. A new truck loading and offloading area will be provided for ULSD receipt and issue west of the existing truck fill stands. Additionally, a return to bulk station will be constructed at the existing JP-8 truck fill stand. In place of Fuel Farm #3, a new Retail Station with two ULSD and two JP-8 dispensers will be constructed. The existing USTs for retail sales will be reused. The new service station building will contain an office, bathroom, and eyewash station. Site Visit: IAW FAR 52.236-27 SITE VISIT (Construction) Alternate I (Feb1995). If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of the basic provision: (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Bidders are urged and expected to inspect the site where the work will be performed. (b) An organized site visit has been scheduled for 24 May 2023 at 10:00AM AKDT. i. If interested parties would like to attend the site visit and requires temporary base access, please contact Christopher Nelson at Christopher.Nelson.70@us.af.mil at least three (3) days prior to the site visit. (c) Participants will meet at BLDG 10480 Sijan Avenue in RM 211. After a brief discussion, all parties will be escorted to the site where the work will be performed. Questions Due Date: 26 June 2023 at 1300 (AKDT). Due to the importance of maintaining the schedule for this project, it is requested that all questions regarding the specifications and/or drawings be submitted by 10:00 AM AKDT, Thursday, 1 June 2023. All questions must be in writing and shall be emailed to Christopher.Nelson.70@us.af.mil and Brian.Barcelona@us.af.mil with the SUBJECT identified as "FA500023B0001 - QUESTION". Any questions received after the above date and time are at the discretion of the Contracting Officer. Requests for hardcopies of the solicitation, specifications, drawings, and amendments (if applicable) will not be honored. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.