Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 27, 2023

January 15, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$395,000.00

Public - City

img_map_placeholder

Multiple Locations, Vista, CA

Subscribe to View Full Documents

The Work generally consists of: stormwater pollution prevention and erosion control, demolition and removal/disposal, traffic control and construction staging, clearing and grubbing, site grading and subgrade preparation, aggregate base, PCC curb & gutter, PCC curb ramps and spandrel, PCC driveway, PCC sidewalk, asphalt concrete paving for street structural section repair, signing and striping, pervious concrete water quality infiltration swale, ADA ramps and existing utility adjustments to grade, utility coordination, cold milling, AC paving, signing, restriping and other related work. The project improvements are shown on the plans D-4678, LD23-021 included in the bid package. 2023 Pedestrian MOBILITY SIDEWALK PROJECT - Avenida De Benito Juarez from W. California Ave to W. Connecticut Ave. (C.I.P. No. 8290) in strict accordance with the Project Specifications, Plans and Appendix D exhibits on file in the City of Vista Engineering Department. Minimum wage rates predetermined by the Secretary of Labour and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labour, the Contractor and subcontractors shall not pay less than the higher wage rate. The Supplementary General Conditions contain additional information regarding State and Federal prevailing wages. minimum wage rates predetermined by the Secretary of Labour and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labour, the Contractor and subcontractors shall not pay less than the higher wage rate. The Supplementary General Conditions contain additional information regarding State and Federal prevailing wages. The Agency, in its sole discretion, reserves the right to reject any or all bids, and to waive any informalities or minor irregularities in the Bids, unless waiving such irregularity would give a competitive advantage to a Bidder. Each bidder shall submit with his bid an unconditional certified or cashier's check drawn on a solvent state or national bank, or a bidder's bond with a responsible corporate surety, on the form attached hereto, subject to the provisions for "Bonds" herein. Unless otherwise stated in the Contract Documents, said bid security or bidder's bond shall be in a sum at least ten percent (10%) of the total base bid amount, and shall be made payable to the Agency as a guaranty that the bidder will, if an award is made, in accordance with the terms of his bid, promptly execute a Contract in the required form, secure payment of Workmen's Compensation, and furnish satisfactory Performance Bond, Payment Bond, and certificates of insurance, and endorsements within ten (10) Working Days following the posting of the Notice of Intent to Award a contract. Question Deadline 10/20/2023 at 2:00 PM PT. The Engineer's Opinion of Probable Construction Cost for this Project is Three hundred ninety five thousand dollars ($395,000)

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.