Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 13, 2023

December 8, 2023

August 29, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$11,890,802.00

Public - City

img_map_placeholder

Multiple Locations, Frisco, TX

Subscribe to View Full Documents

Road to Panther Creek Parkway, and 1,400 LF of bridge widening over Stewart Creek. Work includes but is not limited to grading, paving, sidewalks, drainage, bridge structure, pavement markings/signage, and traffic signal at various locations as shown in the Location maps. Paving work must be completed within 575 calendar days. Liquidated damages will be assessed after 630 calendar days if Contractor fails to meet this requirement. Questions Due Date: Oct 4th 2023, 5:00 PMC DT Location Project #14130 From Lebanon Rd to Eldorado Pkwy Project #18120 From Eldorado Pkwy to Panther Creek Pkwy Bidders must submit with their bids a cashier's check in the amount of five percent (5%) of the maximum amount bid. The OWNER reserves the right to reject any or all bids and to waive any irregularities or formalities. In case of ambiguity or lack of clearness in stating the price of the bids, the OWNER reserves the right to consider the most advantageous construction thereof, or to reject the bid. Unreasonable or unbalanced unit prices will be considered sufficient cause of rejection of any bid or bids. Liquidated damages will be assessed after 630 calendar days if CONTRACTOR fails to meet this requirement Estimate of Probable Cost Range: $1,350,000 to $2,350,000 The project, Dallas Parkway Improvements Phase 4, generally includes the construction of approximately 17,000 SY of pavement widening along Dallas Parkway from Lebanon Road to Panther Creek Parkway, and 1,400 LF of bridge widening over Stewart Creek. Work includes but is not limited to grading, paving, sidewalks, drainage, bridge structure, pavement markings/signage, and traffic signal at various locations as shown in the Location Maps. Paving work must be complete within 575 calendar days. Liquidated damages will be assessed after 575 calendar days if CONTRACTOR fails to meet this requirement. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

41 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.