Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 26, 2023

May 26, 2023

December 31, 2023

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

To Be Determined, Afton, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

San Bernardino County Fire Protection District is sourcing an audio-visual system design, including electrical needs, HVAC needs, infrastructure, lighting, sound system, visual aids, network, etc. Date for Tentative Contract Award May/June Deadline for Submission of Questions 5:00 pm PST 4/07/2023 The County is seeking Proposals for an audio-visual system design, including electrical needs, HVAC needs, infrastructure, lighting, sound system, visual aids, network, etc. Attached in ePro is a conceptual floor plan for each room. We are looking for the latest and most efficient technology. Please note, these plans include our proposed needs, but we will rely upon the Proposers expertise and recommendations for the best set-up to meet our needs. Proposal should include a breakdown of the equipment/materials by room for the design. 2. Proposal must include the following rooms: a. Conference Rooms - There are 6 conference rooms throughout the building. All should contain the same setup. b. Assembly Room (1st floor). c. Training Room (2nd floor) - Can be broken into 2 separate rooms by folding partition. d. Photography/Podcast Studio (Labelled "Green Room" on plans) (2nd floor). e. Broadcast Studio (Labelled "Press Briefing Room" on plans) (2nd floor). - A control room set up to the back side/west side of studio - Room is enclosed with doors to both sides a. A floor plan and electrical plan are included in ePro showing the aforementioned rooms and sizes. The building is currently "gutted." b. An estimated needs and equipment list is attached in ePro as SBCoFD HQ Audio Visual Plan. c. Once the final design has been accepted by the County, the actual implementation will be bid out as a capital improvement project in accordance with State and County Public Works requirements. The company who is awarded the design is entitled to bid on the audio-visual system project and installation. d. Proposer may include an estimated cost proposal breakdown by room.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects