Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 25, 2023

September 18, 2023

February 5, 2024

Main St

Paving, Site Work

No Information to Display

$1,430,606.00

Public - City

img_map_placeholder

Main St, Half Moon Bay, CA

Subscribe to View Full Documents

**As of August 22,2023, this project has not yet been awarded. The project is expected to be awarded on September 2023.** In general, this project includes improvements that offer safe access for pedestrians, bicyclists, and vehicles along the 850-foot Poplar Street corridor from the SAMS Route 294 Bus Stop to the Highway. The anticipated enhancements include pedestrian and bicycle access, drainage improvements, and traffic calming measures. The successful bidder will be required to pay not less than the prevailing rate of per diem wages as determined by the California Department of Industrial Relations on the date the work is performed. Questions must be received by no later than Tuesday, July 11, 2023, by 5:00 P.M. Requests for information on receiving bid packages or questions concerning the project should be directed to Project Manager/Engineer Jonathan Woo at the City Hall, 501 Main Street, by phone: (650) 726-8265, Fax: (650) 726-8261 or e-mail: jwoo@hmbcity.com. The Engineer's Estimate for the base bid is $1,580,416, $19,800 for the Bid Alternate, and $67,000 for the bid additive. The DBE Goal is 10%. All bids must include a bidder's bond or certified check for at least ten (10) percent of the total bid price including any additive items. Bonds or securities assuring faithful performance and payment for labor and materials in an amount of at least one hundred (100) percent of the contract amount, and insurance policies as required by the contract documents shall be furnished to the City upon execution of the contract.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects