Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 10, 2024

No Information to Display

3001 12e Avenue N

Renovation

No Information to Display

$800,000.00

Public - State/Provincial

img_map_placeholder

3001 12e Avenue N, Sherbrooke, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The URDM redevelopment project in Fleurimont will be divided into 2 mandates. TIMELINE: Contract for architectural services to complete design and conduct construction surveillance has been awarded. Reference number: 1710185. Mandate 1 consists of the development of a study which will make it possible to establish the orientations and the principles which will meet the requirements of the needs, the requirements, the additions of equipment and will allow the correction of non-conformities named by the CERDM. division of the INSPQ. The equipment added will be two adjustable sink stations, a trolley washer, a washer-disinfector, a steam sterilizer and the infrastructure for the implementation of traceability software. After the study, mandate 2 will be the preparation of plans and specifications for the call for tenders and as well as providing assistance during construction. The plans and specifications will be produced according to the result approved by the authorities of the CIUSSS de l'Estrie CHUS and respecting the parameters of content, quality, cost and schedule. The construction work will be carried out in several phases, maintaining the activities of the URDM throughout the duration of the project. Further update in late summer/fall, 2023.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects