Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 1, 2024

No Information to Display

To Be Determined

Site Work

No Information to Display

$3,402,800.00

Public - City

img_map_placeholder

To Be Determined, Longmont, CO

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project will address corrosion issues, rehabilitation of mechanical system issues, installation of remote outlet controls, upgraded telecommunication systems, inlet/outlet stream gauge station improvements, telemetry system for dam monitoring wells, upgraded outlet flow monitoring equipment, and various improvements as determined throughout the operation of an aging reservoir that was built in 1969. Projects include the following: 2024 Projects: Design and replace mechanical outlet controls and flow meters, identify and create a geohazard mitigation plan, installation of a permanent backup generator for the control house, installation of new telecommunication and network services (including outlet building intercom system), improvements to site access and security, construction of new storage facility. 2025 Projects: Execute geohazard mitigation plan. 2026 Projects: Future Button Rock Dam repairs/improvements 2027 Projects: Future Button Rock Dam repairs/improvements, design of new reservoir inlet/outlet stream gauges. 2028 Projects: Future Button Rock Dam repairs/improvements, emergency gate overhaul and repairs, construction of new reservoir inlet/outlet stream gauges. As of September 23, 2024, this project is in the City of Longmont's Capital Budget FY 2024 - 2028 CIP. Information regarding a design firm or detailed timeline for construction have not been established, but funding is allotted for FY 2024-2028. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.