Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 18, 2023

November 6, 2023

February 16, 2026

Multiple Locations

Renovation, Site Work

No Information to Display

$16,370,000.00

Public - City

img_map_placeholder

Multiple Locations, Olathe, KS

Subscribe to View Full Documents

The work consists of the following: BASE BID . WTP2 Redundant Power improvements including installation of a new secondary utility feed to the plant and relocation of the existing WTP2 standby engine-generator. . WTP2 Power Distribution improvements including installation of a complete medium voltage loop around WTP2 with step down transformers. . Horizontal Collector Well Redundant Power improvements including installation of standby generators to Horizontal Collector Wells 3 and 4, new automatic transfer switches (ATS) and an elevated concrete structure provided at each well. . SCADA Improvements that include replacing all SLC5/05 PLCs and installation of a fiber network loop. . WTP2 Chemical Feed Improvements including completion of the plant chemical ductbank loop, replacing and relocating the fluoride feed system, membrane building chemical storage improvements, and ammonia system storage improvements. . Sanitary Sewer Improvements including rerouting the sewer mound system such that it will be able to pump offsite. The pumps at the existing sanitary lift station will also be replaced. BID ALTERNATIVES A. DA-1: Membrane Building Control Room Expansion improvements will include all work associated with expanding the existing control room to the east. B. DA-2: Filter Building Fluoride Room Rehabilitation, including any work associated with the demolition of electrical conduit, lighting, concrete floor, hvac, and door replacement. Demolition of existing fluoride tank, pump skid, and capping existing electrical or chemical piping is not included in this bid alternative and will be completed no matter what. Last day of questions: 5:00 p.m., Friday, April 28, 2023

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.