Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 27, 2023

May 29, 2023

June 18, 2023

3600 Workman Mill Rd

Renovation

No Information to Display

$189,000.00

Public - County

img_map_placeholder

3600 Workman Mill Rd, Whittier, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

1. Remove and install a brand-new open duct system inside classrooms B-12 and B-11. Scope includes: a. Remove and dispose existing duct system. b. Demo all T-Bar ceilings, remove tiles, T-Bar metal and hanging wires. c. Install new open duct system. d. Demo all stucco form e. Install stucco patch 8' X 40' f. Polybond coat, brown coat and finish coat. g. Remove all existing flexible ducts and replace with spiral ducts (22 or 24 gauge). h. Install new A/C registers i. All duct work to be suspended through wires (metal hangers). j. Install three (3) strips of black LED track lights, with thirty (30) LED light track hats, ten (10) pieces per line, and motion switches on existing locations. k. Paint wall ceilings of classrooms and duct work. Ceiling to be painted with elastomeric primer base (2 coats). Elastromeric paint (color black / 2 coats). A/C Duct work to be painted all black. l. Provide one (1) scissor lift (as needed) m. Provide 8-foot / 10-foot / 12-foot A-Frame ladders (as needed) n. Provide trash clean-up and disposal. o. Cover all cabinets and floor inside the classrooms with plastic, ram board paper or plywood. p. Remove all existing furniture in the classrooms prior to performance of the work. questions and requests April 14, 2023, at 2:30 p.m

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects