Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 26, 2023

June 26, 2023

February 5, 2024

Multiple Locations

New Construction, Site Work

No Information to Display

$1,843,150.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Port Jefferson Station, NY

Subscribe to View Full Documents

AS of July 13, 2023, the project has been awarded. A timeline for construction has not been confirmed. Provide Salt Storage Buildings - Port Jefferson and Sunnyside (Plainview) - Construction M - W 5% - 5% SDVOB Goal 3% Estimated Cost $2,000,000 - $3,000,000 Bid Deposit $76,700 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Provide a SITE SPECIFIC SAFETY PLAN no later than 15 days after approval of the Contract by the Comptroller. The plan must include at a minimum: 1. Cover page including Project Name/Location/Project Number/Contractor Name/Potential Start/Finish Dates. 2. Complete Scope of work. 3. Roles and Responsibilities page identifying Supervision, list of the names of all competent and/or qualified persons, including their qualifications, for each activity requiring a competent person i.e. excavations, scaffolding, rigging, fall protection, etc. 4. A program for implementing appropriate PPE as specified in the High 5. Hazard Assessment detailed in Subparagraph 1.04 A.11 below. 5. A program for assuring employees have proper work attire, i.e. substantial sole safety-toed footwear, long pants, shirts with minimum 4- inch sleeves, etc *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

75 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.