Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 21, 2023

February 15, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$54,700,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Salt Lake City, UT

Subscribe to View Full Documents

Relocation of utility and addition of utilities to the station platforms Construction of station platforms including all the utilities and the canopies structures. This includes snow melts systems for center stations and all canopy roofs as well as the necessary accessories for the stations. An extension of the North Jordan Canal. Construction of an exclusive busway along 4700 South which includes conforming to the Geotech report for the soils in the median Construct post and panel walls throughout the project Traffic control during construction Upgrading signals to accommodate including adding a TSP system. Signing and striping ATMS, Lighting and communications with connections to the UTA hubs Installation of UTA provided overhead chargers. Storm drain installation Re-landscaping disturbed areas Improvements to the West Valley Station Improvements to the Murray Station including coordination with Murray City for work within the environmentally sensitive Smelter Site Overlay District (SSOD) Construct a new bus stop hub at Salt Lake Community College (SLCC). Removal of the old hub at SLCC Following all environmental, quality and safety requirements Constructing the project with the proper Buy America requirements Assisting UTA with Public Relations as needed to provide property owners and the public understanding of project schedule and impacts to their properties/accesses. Contractor shall pay its employees and also ensure its sub-tier contractors at every level pay their eligible employees the prevailing wage rate as established by the Utah State Labor Commission. Unless otherwise excused by the terms of the Contract Documents, Contractors failure to timely perform the Work in accordance with the completion milestones shall result in the assessment of liquidated damages (if, and to the extent, set forth in the Agreement) and (where no liquidated damages are provided under the Agreement or where the maximum liquidated damages available under the Agreement have been incurred) an event of default. Project Start Date Estimated February 15, 2024 A Performance Bond equal to 100% of the Contract price provided prior to formal contract execution; and A Payment Bond equal to 100% of the Contract price provided prior to formal contract execution. Construct the Mid-Valley BRT project in a timely, safe, and efficient manner. This project is anticipated to be completed and activated for revenue service in 2026. Question Deadline 10/17/2023 at 2:00 PM Questions and Requests for changes to the RFP must be submitted via the SciQuest Q&A page before the end of the Question-and-Answer period UTA reserves the right to make changes to the RFP, by issuing a written addendum to the RFP which will be posted to SciQuest Construct Bus Rapid Transit infrastructure including stations, roadway, electrical, and communication systems.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects