Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2023

December 4, 2023

October 2, 2024

555 College Ave

New Construction, Site Work

No Information to Display

$27,425,000.00

Public - City

img_map_placeholder

555 College Ave, Lemoore, CA

Subscribe to View Full Documents

This project consists of site development and construction of a new instructional building at the West Hills College Lemoore campus. The two-story 42,718 gross square feet (GSF) Building contains 16,270 assignable square feet (ASF) Comprised of 3,840 ASF lecture, 8,630 ASF Lab, 870 ASF office, 980 ASF AV/TV, and 1,950 ASF other (Data processing, meeting room) Spaces. The removal of two portables, classrooms of 9,680 SF total, is included in this scope of work. This project is anticipated to start on approximately December 4, 2023 and is anticipated to have a duration of 450 calendar days for completion

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.