Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 4, 2023

July 4, 2023

November 14, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$17,581,944.00

Public - City

img_map_placeholder

Multiple Locations, Plattsmouth, NE

Subscribe to View Full Documents

As of June 6, 2023, the project has not been awarded. A timeline for award has not been confirmed. The extent of the project is as follows: The project generally includes the installation of approximately 21,000 LF of nominal inside diameter 24-inch and 12-inch trenched or trenchless sanitary sewer force main, 2,270 LF of storm sewer, 1,685 LF of 8-inch and 6-inch water main, water services, 17,750 SY of PCC mainline paving, 3,000 SY of sidewalk or multi-use trail removal and/or installation, 1,410 SY of PCC driveway installation, 15 acres of seeding, 5,250 SF of block segmental retaining wall installation, erosion control, and other associated work. The Contractor's bid bond, certified check, or cashier's check shall be in an amount of 5% of the Contractor's bid amount made payable to the Treasurer of the City of Plattsmouth, Nebraska. The certified or cashier's check may be cashed by the Owner, or the bid bond forfeited to the Owner as liquidated damages in the event the successful bidder fails to enter into a Contract and file an acceptable bond satisfactory to the Owner assuring the faithful fulfillment of the Contract and maintenance of said improvements, as required by law, within ten days after the acceptance of the Contractor's bid. No Bidder shall withdraw his Bid for at least 30 days after the actual date of the receipt of bids The Owner reserves the right to reject any and all bids, to waive irregularities and informalities therein and to award the Contract in the best interest of the Owner.

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.