Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
February 7, 2024
April 8, 2024
April 8, 2026
Multiple Locations
Site Work
No Information to Display
$40,000,000.00
Public - State/Provincial
Multiple Locations, Concord, NC
The proposed sanitary sewer interceptor will be constructed in two phases; the first phase (base bid) extends from Rocky River Road up to Wolf Meadow Creek and the second phase (bid alternate) extends from Wolf Meadow Creek to approximately Coddle Creek Drive SW. In total the two phases will consist of approximately 39 LF of 60" fiberglass pipe, 39 LF of 54" fiberglass pipe, 20,013 LF of 48" fiberglass and ductile iron pipe, 7,943 LF of 36" fiberglass and ductile iron pipe, 1,395 LF of 30" fiberglass and ductile iron pipe, three cast-in-place concrete diversion structures, 11 manholes with 5' diameter base and 5' diameter riser structure, 30 manholes with 6' diameter base and 5' diameter riser structure, 73 manholes with 7' diameter base and 5' diameter riser structure, one manhole with 8' diameter base and 5' diameter riser structure, three manholes with 10' diameter base and 5' diameter riser structure, one trenchless crossing at Roberta Road (SR-1304), and 21 sanitary sewer stream crossings. The project also includes miscellaneous rehabilitation of the existing sanitary sewer system including 1,898 LF of CIPP and miscellaneous manhole rehabilitation. For information regarding this project please contact: Morgan Hampy Gavel & Dorn Engineering 6730 Freedom Drive, Charlotte, NC 28214 Phone: 704-919-1900 x216 Email: mhampy@gaveldorn.com Bidders must be licensed contractors in the State of North Carolina. All Subcontractors must also be licensed contractors in the State of North Carolina. Bids will be received on a unit price basis. Bid security in an amount of 5 percent of the Bidder's maximum Bid must accompany each Bid. The Successful Bidder will be required to furnish a Construction Performance Bond and a Construction Payment Bond as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract. Contractor and all Subcontractors will be required to conform to the labor standards employment requirements set forth in the Contract Documents. The Bidder is required to make a good faith effort to meet a 10 percent goal for minority business participation in the total value of Work in accordance with State G.S. 143-128.2. The Bidder shall identify efforts made in this regard and list minority business enterprises that will be used on the project as required in the Bidding Documents. If the Contract is to be awarded, Owner will give the Successful Bidder a Notice of Award within the number of days set forth in the Bid Form for acceptance of the Bid.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Concord, NC
Bid Date: Oct 22 2024
Concord, NC
Bid Date: Oct 09 2024
Concord, NC
Bid Date: Sep 24 2024
Concord, NC
Bid Date: Sep 26 2024
Concord, NC
Bid Date: Jan 30 2024
Concord, NC
Bid Date: Nov 15 2023
Concord, NC
Bid Date: Nov 01 2023
Concord, NC
Bid Date: Nov 21 2023
Concord, NC
Bid Date: Nov 21 2023
Concord, NC
Bid Date: Sep 27 2023
Concord, NC
--
Concord, NC
Bid Date: Sep 06 2023
Concord, NC
Bid Date: Feb 07 2023
Concord, NC
Bid Date: Feb 14 2023
Concord, NC
Bid Date: Feb 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
