Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 10, 2023

July 24, 2023

October 14, 2024

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Toronto, ON

Subscribe to View Full Documents

Sanitary Forcemain Replacement Project Group 2 - Phase 1 (23TW-CTS-11CWD). This contract includes Work at three (3) Sewage Pumping Stations (SPS) in the City of Toronto, namely, Cumber SPS, Mimico SPS, and New Toronto SPS. There are following Works, in general, to be performed at these SPS: Cumber SPS: - Approximately 443 m of Twin 600 mm diameter Forcemains installation on Lawrence Avenue East from the SPS to the proposed Discharge Maintenance Hole including new Valve Chamber installation and replacement of the existing Valve Chamber, and - Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Mimico SPS: - Approximately 20 m of Twin 600 mm diameter Forcemains installation including replacement of the existing Valve Chamber, - New Valve Chamber installations on the existing 600 mm diameter Forcemains at Albert Avenue and Cavell Avenue intersection, and - Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. New Toronto SPS: - Approximately 22 m of Twin 500 mm diameter Forcemains installation including replacement of existing valves, - New Valve Chamber installation on the existing 500 mm diameter Forcemain at Morrison Street and Eleventh Street, and - Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Additionally, this contract also includes in general: A pre-survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, replacement of valves, abandonment and/or removal of the existing pipes, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration. The Substantial Performance of the Work shall be completed within 300 Working Days after Commencement Date.The Total Performance of the Work shall be completed within 320 Working Days after Commencement Date. Documents can be obtained at: http://discovery.ariba.com/rfx/15720252 * The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Bid Panel on August 2, 2023. Contract Award Value: $17,539,027 net of all applicable taxes and charges $19,819,101 including HST and all applicable charges $17,847,714 net of HST recoveries

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.