Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 18, 2023

September 4, 2023

August 1, 2024

3384 Indigo Ave

Renovation

No Information to Display

$299,925.00

Public - County

img_map_placeholder

3384 Indigo Ave, Adair, IA

Subscribe to View Full Documents

Adair-Casey Junior High Bleacher Project REBID - Adair, IA. Project number is 123.0197.09 and is located at 3384 Indigo Avenue, Adair, IA 50002. Project includes the removal of the existing stadium bleachers, proposed bleacher grandstand including new foundations and other miscellaneous site improvements. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. Said bond shall be issued by a responsible surety approved by Adair-Casey Community School District and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless Adair-Casey Community School District from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two years from and after acceptance of the contract. The guaranteed maintenance period for new paving shall be four years. Contractor shall fully complete the project no later than August 1, 2024 for Substantial Completion and August 23, 2024 for Final Completion and ready for use. Should the contractor fail to complete the work in this timeframe, liquidated damages of $500.00 per calendar day will be assessed for work not completed within the designated contract term. Notice to Proceed is anticipated on September 4, 2023. The Adair-Casey Community School District does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the jurisdiction.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects