Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

September 8, 2023

January 3, 2025

To Be Determined

Addition, Demolition, Paving, Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

To Be Determined, Rapid City, SD

Subscribe to View Full Documents

This is for the furnishing of materials, labor, equipment and skill required for the purpose of Demolition, Grading, Geotextile, Aggregate Base Course, Curb and Gutter, Manholes, Water/Wastewater Infrastructure, Storm Pipe Installation, Chain Link Fence, Concrete Paving, Lighting, Pavement Marking, Signage, Building Additions, and Other Miscellaneous Work as is more fully described and set forth in the Plans and Project Manual, which are now on file in the office of the MAP-21 Program, Rosebud Sioux Tribe, Mission, South Dakota and at the office of KLJ. The Rosebud Sioux Tribe reserves the right to reject any and all bids, to waive any informality in any bid, to hold all bids for a period not to exceed sixty (60) days from the date of opening bids, and to accept the bid deemed most favorable to the interest of the Tribe. certified check or cashier s check or draft for five percent (5%) (Labor and Materials) Payment Bond, each in the amount of one hundred percent (100%)

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.