Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 6, 2023

May 5, 2023

June 4, 2023

Alley E

Paving, Site Work

No Information to Display

$33,162.00

Public - City

img_map_placeholder

Alley E, Aspinwall, PA

Subscribe to View Full Documents

Alley E - Pavement and Drainage Technical questions pertinent to the work to be performed under this Contract may be addressed to Robert E. Zischkau, Jr. Glenn Engineering & Associates, Ltd. 14920 Route 30 North Huntingdon, PA 15642 Phone: 412-824-5672 Fax: 412-824-9587 E-mail: bobz@gknnengr.com LOCATION OF THE WORK All work under this Contract will be performed on Aspinwall Street and Fourth Avenue within the Borough of Aspinwall, Allegheny County, Pennsylvania. The Borough is located in northeastern Allegheny County along the west bank ofthe Allegheny River approximately eight miles northeast ofthe downtown area ofthe City ofPittsburgh. 9. CLEANUP The Contractor shall be responsible for regular cleaning up ofthe premises. All refuse, dirt, rubbish, and trash of any kind shall be removed regardless of who may have left same. All such dirt and debris shall be removed from the Owner's property. All removedmaterials and equipment, which may have salvageable value, will remain the property ofthe Owner, unless otherwise advised by the Owner. 3. GENERAL DESCRIPTION OF PROJECT The work under this project includesthe furnishing ofall labor, materials, and equipment required forthe performance of all rehabilitation as indicated in the Contract Documents. The work essentially includes site preparation, milling ofexisting bituminous pavement and additional site grading, placement ofadditional subbase material and compaction storm inlet construction and placement of PVC piping, placement of bituminous pavement, , and all required restoration, and all other related appurtenances

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects