Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 13, 2023

May 1, 2023

May 1, 2024

1147 Union Cir

Renovation

No Information to Display

$2,274,722.00

Public - State/Provincial

img_map_placeholder

1147 Union Cir, Denton, TX

Subscribe to View Full Documents

This project to build an integrated student services support center. The center will modernize, streamline and holistically support the student experience, while improving efficiency and service. The physical center will reduce student telephone inquiries; reduction in case load and increase productivity; improve overall retention and persistence; reduction of student related bad debt. The work will be done in accordance with the plans and project manual. Contractor to provide detailed construction schedule according to the phases required: Ph1A - partial demolition (by UNT - not part of bid) Ph1B - Build back Substantial completion of 1st floor Registrar and 2nd floor Financial Aid by July 14 Ph2 - Demo and build back of ISSC Center 2nd floor from 7/17 - 10/6 Ph3A - 1st floor Student Accounting finishes upgrade 10/9 - 12/1 Ph3B - 1st and 2nd floor corridors/lobbies and restroom upgrades 12/4 - 1/5. Questions concerning this proposal should be directed to: Carrie Stoeckert Senior Construction Contract Coordinator University of North Texas System Strategic Infrastructure, Planning & Construction Carrie.stoeckert@untsystem.edu All questions must be received no later than 2:00 p.m. CST on March 28, 2023. All questions and answers will be posted to the website by 5:00 p.m. CST on March 31, 2023. Stantec Project No. 214001088, 2140001088 Interior renovation of the existing Eagle Student Service Center (built in 1985) on UNT Denton Campus. The work will take place in Three Phases Phase 1: Buildback of First floor Registrar and Second floor Financial Aid : Substantial completion by July 21, 2023. 2. Phase 2: Demolition and buildback of Second floor ISSC (former Registrar) including smoke barrier on Third floor: Substantial completion by October 6, 2023. 3. Phase 3: First floor Student Accounting, First and Second floor corridors / lobbies, and First and Second floor public restrooms : Substantial completion by 1/5/2024

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.