Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 17, 2023

May 17, 2023

June 26, 2023

To Be Determined

Paving, Site Work

No Information to Display

$192,000.00

Public - City

img_map_placeholder

To Be Determined, Kyle, TX

Subscribe to View Full Documents

Separate sealed bids addressed to the City of Kyle, ATTENTION: CITY ENGINEER, will be received for furnishing all labor, material, tools and equipment and performing all work required for: KOHLERS CROSSING, including: Pavement Spot Repairs, Mill and Inlay (7,940 ft.), and striping. Misc.: Traffic Control and flagging as shown on drawings. Bidders should carefully examine the plans, specifications and other documents, visit the site of work, and fully inform themselves as to all conditions and matters which can in any way affect the work or the cost thereof. Should a bidder find discrepancies in, or omissions from, the plans, specifications or other documents, or should in doubt as to their meaning, bidder should notify the Project Engineer via website. Obtain clarification prior to submitting any bid, but no later than 5:00 p.m. April 7, 2023. Answer to the questions pertaining to the bid and addendums will be posted on website no later than 5:00 p.m. April 12, 2023. Bidder shall be responsible to check the website site before submitting bid. Overview of project Spot Repair Limits - FM 2770 to IH 35 SB FR Milling Depths - Depth will vary per Spot. 3" to 9" Milling on Main Lanes only, no milling in Turn Bays Contract Time : 30 days substantial Completion, 40 days Complete (Maximum 4 day closure at RR tracks Marketplace W to ACC). Liquidated Damages: $685.00/day MP# 198.10 Four Repair areas for WB direction of Travel Length varying from 200 ft to 2820 ft(Estimated at 10720 sy of pavement removal & 2129 Tons TY C HMA needed for Repair) Three Repair areas for EB direction of Travel length vary from 400 ft to 2820 ft (Estimated at 10,453 sy of pavement removal & 3020 Tons TY C HMA needed for Repair) Small Sign Removal and Installation at RR crossing & between Kyle Crossing & IH 35 SB FR For EB travel lanes. Striping for spot areas.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.