Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2023

August 14, 2023

August 6, 2026

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

To Be Determined, Las Vegas, NV

Subscribe to View Full Documents

Inbound Conveyors; Upgrade of eight inbound Baggage Handling System (BHS) bag claim carousel units at T-1 and replace entirely eight inbound BHS bag claim carousel units at T-1. This scope includes but is not limited to a total of 32 in-feed conveyors on 16 units, motor controls, control systems, and supporting hardware, including interfaces to the Johnson Controls Inc (JCI) security system and supporting CCTV. Question Cuttoff Date & Time 7/4/2023 01:00:00 AM (ET) Project has been cancelled Task 1: Inbound Conveyors; Upgrade of eight inbound Baggage Handling System (BHS) bag claim carousel units at T-1 and replace entirely eight inbound BHS bag claim carousel units at T-1. This scope includes but is not limited to a total of 32 infeed conveyors on 16 units, motor controls, control systems, and supporting hardware, including interfaces to the Johnson Controls Inc (JCI) security system and supporting CCTV. Reference technical specifications and drawings for more details. Task 2: Installation of Inbound Cameras. Reference technical specifications and drawings for more details. Task 3: Power Relocation at T-1; Reconfigure standby generator power at T-1 to select ticket counters and oversize conveyors to allow "trickle" operations during utility power interruption. Includes the installation of a new control panel for standalone system operation and modification of emergency stop circuits. Reference technical specifications and drawings for more details. Task 4: UPS at T-1; Run network conduit and cabling to each uninterruptible power supply (UPS) units serving the BHS (to support future SCADA capability) at T-1 and integrate into owners existing maintenance diagnostic systems software package (MDS). Reference technical specifications and drawings for more details. Task 5: T-3 Recontrol; Upgrade all BHS Supervisory Computers and Outbound PLCs at T-3. Reprogram per Owner specifications all outbound and inbound PLCs at T-3. This scope includes the installation of a new control panel as well as new device level networking for all BHS devices. Reference technical specifications and drawings for more details. DBE goal of 14.4% Site Area Located at the northwest corner of Paradise and Bell, Laydown Area West of T1 Parking Garage A Project Site Tour will be conducted following the conclusion of the pre-bid presentation. We have arranged for transportation to and from the site. If you will be attending, please send an email noting your company's name and number of attendees to contracts@lasairport.com.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.