Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 6, 2023

December 6, 2023

September 30, 2025

1290 Athens Hwy

Renovation

No Information to Display

$1,048,338.00

Public - County

img_map_placeholder

1290 Athens Hwy, Gainesville, GA

Subscribe to View Full Documents

The owner has selected a Construction Manager - Hogan Construction Group. Total Pre-construction Sum, Construction Phase General Conditions Costs, and CM/GC's Fee is $1,048,337.67. Hall County, Georgia is seeking Statements of Qualifications with a Proposal of Guaranteed Maximum Price (GMP) from Construction Managers at Risk (CMAR) (herein "Contractor") by Thursday, March 30, 2023, no later than 2:00pm EST. The Contractor will work with the County in the management of pre-construction and construction services for a new Medical Office Building (MOB) for use by the Northeast Georgia Physicians Group, located at the Butler Community Center, and renovations of the adjacent, existing Hall County Health Department building, located at 1290 Athens Street, Gainesville, GA 30507. This project includes construction of a new building of approximately 8,065 square feet and phased renovation while in use of an existing building of approximately 33,200 square feet to include addition of a drive-through. The total project budget is nine million, three hundred seventy-five thousand, seven hundred and no/100 ($9,375,700.00), inclusive of pre-construction, construction, contingency, and other Owner associated costs. The American Rescue Plan Act (ARPA) is the funding source. The County will evaluate proposals through a cost and qualification-based selection process intended to confirm the Contractor's ability to work in conjunction with the combined project's two architects, the Owner and tenants. The anticipate Medical Office Building's completion date is by January 31, 2024, with the total project anticipated completion date by September 30, 2025. *At 1290 Athens Street, Gainesville, GA 30507.

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.