Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 18, 2024

March 26, 2024

November 21, 2024

11149 US-16

Renovation

No Information to Display

$1,000,000.00

Public - Federal

img_map_placeholder

11149 US-16, Custer, SD

Subscribe to View Full Documents

This is a invitation of bid (IFB) for construction services needed to replace HVAC system at Jewel Cave National Monument. Notice ID :140P6324B0003 Project Description: Removal of the boiler and hot water pumps, chiller and all associated chilled water piping and system, fan coils and some associated ductwork and a ground mounted rooftop. Additionally, a split system serving the elevator equipment room will be removed. A new air handler will be installed on the 2nd floor to serve the space served by the fan coils and rooftop unit. The new air handler will utilize VAV boxes with hot water reheat to provide zoning to the building. A new hot water boiler will be installed in the basement to provide heating. An air cooled condensing unit will be connected to the air handler to provide cooling. A new split system will be installed in the elevator equipment room on the 3rd floor. Associated electrical and architectural work to support the mechanical work is also included. Temporary heating and cooling are not anticipated based on coordination of downtime of systems during mild weather, however the contractor will be required to provide temporary heating and cooling if systems are shut down during times of the Continued. The Government anticipates that the work will be completed in 240 calendar days, including submittal period, with work tentatively starting in Spring 2024. The final performance period start date is contingent on issuance of Notice to Proceed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Goals for Minority Participation for Each Trade: 7.9% Goals for Female Participation for Each Trade: 6.9% Questions: All questions pertaining to this solicitation shall be submitted IN WRITING via email joseph_kirk@nps.gov. All questions must be submitted in writing no later than 3 days after site visit. Delivery: 240 Days After Notice to Proceed Delivery Location Code: 0010251639 JEWEL CAVE NATIONAL MONUMENT 11149 U.S. HIGHWAY 16 CUSTER SD 57730 US *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.