Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 12, 2023
December 4, 2023
April 2, 2024
9501 Lucy Corr Cir
Renovation
No Information to Display
$1,833,000.00
Public - County
9501 Lucy Corr Cir, Chesterfield, VA
HVAC Renovation Smith-Wagner Building Questions which may arise as a result of this solicitation may be addressed to Tyler V. Tingler, Senior Contract Officer, at (804) 717-6311, or by email to procurement@chesterfield.gov. Inquiries must be received no later than September 28, 2023, at 4:00 p.m. in order to be considered. Should the bidder decide to utilize an express delivery service or hand deliver, please note that the Lane B. Ramsey Building is located at the intersection of Ironbridge Road (State Route 10) and Lori Road. All bids shall be delivered to the Lobby. Bids or changes to a bid response shall not be accepted via fax or email. In the event that Chesterfield County government offices are not operating under normal staffing levels or if the location for bid submission, bid opening or a pre-bid conference is inaccessible due to inclement weather or other emergency situations at the published time, the bid submission, bid opening or pre-bid conference will default to the next regular business day at the same time. All bids shall be signed in the space provided for a signature on the cover sheet and returned. If the bidder is a partnership or corporation, the bidder shall show the title of the individual signing the bid, and if the individual is not the president or vice president of the partnership or corporation, if requested, the bidder SCOPE OF WORK/SPECIFICATIONS -Specifications and Drawings prepared by Thompson Consulting Engineers, dated 08/15/2023 The Commercial Building Permit is included as Attachment D. The proposal from Siemens to provide and install the Building Automation System (BAS) is included in Attachment E. Information regarding use of a brand name is addressed in Section V.B. SPECIAL TERMS AND CONDITIONS, page 19 item 5. Variance in specifications deemed not to be material, in the sole discretion of the County, may be allowed in determining the lowest responsive and responsible bidder. The renovation of the Heating, Ventilation and Air Conditioning systems shall include but is not limited to the following. Field investigation to verify the rooftop duct pathway such that a phenolic duct system can be prefabricated and installed. Installation of a Dedicated Outside Air System (DOAS) for the Smith Wagner Building. One DOAS unit shall be placed on the roof of the building and phenolic ductwork run to connect the DOAS unit to the existing outside air ductwork. Install bipolar ionization devices in all existing heat pumps and coordinate their powering from existing heat pump wiring. Rebalance the entire building, including supply, return, exhaust, and outside air. Coordinate Siemens Controls, the existing BAS Contractor, to control all heat pumps to run fans continuously during occupied operation. Structural reinforcement in accordance with the Structural Set provided by Lynch Mykins. See Attachment C - Drawings. Facility is occupied 8.5 hours a day, Monday through Friday. Construction work may be done between the hours of 8:30 A.M. and 5:00 P.M., Monday through Friday. With the County's prior approval, work may be done after hours including overnight and weekends. The Building Automation System (BAS) manufacturer shall be SIEMENS INDUSTRY, INC. and shall be an extension of the existing building wide automation system (no substitutes). The system has been pre-bid and the proposal amount is included on the BID FORM (Pricing Schedule, Item 2). See Attachment - E Siemens Proposal. Asbestos and all Materials Containing Asbestos: Asbestos containing materials (ACM) are present in the areas of work of this project. All known materials shall be identified to the Contractor by the County prior to starting any work. The County is responsible for the removal of all ACM required by the work of this project. If the Contractor, during the course of Work, observes or suspects the existence of asbestos in an area of the Work, the Contractor shall promptly notify the County. The County will provide the Contractor with the instructions relative to the suspected asbestos material. The Contractor shall not perform any work pertinent to the suspected asbestos material prior to receipt of special instruction from the County.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Chesterfield, VA
Bid Date: Nov 07 2023
Chesterfield, VA
Bid Date: Sep 28 2023
Chesterfield, VA
Bid Date: Nov 20 2023
Chesterfield, VA
Bid Date: Nov 15 2023
Chesterfield, VA
Bid Date: Mar 23 2020
Chesterfield, VA
Bid Date: Nov 16 2023
Chesterfield, VA
Bid Date: Oct 11 2024
Chesterfield, VA
Bid Date: Oct 11 2023
Chesterfield, VA
--
Chesterfield, VA
Bid Date: Aug 02 2023
Virginia Beach, VA
Bid Date: Oct 12 2023
Winchester, VA
Bid Date: Oct 12 2023
Fairfax, VA
Bid Date: Oct 12 2023
Alexandria, VA
Bid Date: Oct 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
