Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 1, 2023

No Information to Display

74 2nd St

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

74 2nd St, Cochrane, ON

Our team is requesting plans for this project.

Subscribe to View Full Documents

The consultant's scope of services as described but not limited to the Schedule A Prime Consultant's Services and including below project specific requirements:1080260 The intent of the project is to complete necessary repairs to the building envelope of MTO 6 Bay Patrol Garage (B14922). Refer to Building Envelope Study (Project #1064907). The scope to include the following: 1) Removal of rust, painting steel door and frame with zinc-rich primer and finish coat in 6-bay garage. 2) Repairing the exposed spray foam insulation around the window at the 6-bay garage to restore the air/vapour barrier and to prevent cold draft discomfort and save energy, along with installation of a metal closure to protect the insulation from UV. Project is to bundle with (#1080378). The project shall be in compliance with the latest IO Design and Commissioning Guidelines. The consultant shall produce specifications for the proposed repairs; prepare tendering package, carry out onsite QA, work inspection, provide closeout, warranty & inspection documents. Contractor is required to provide a timeline for the system installation, which shall be approved by the client, as not to interrupt Ministry programs. A project specific DSS will be required as ACMs are present and have been confirmed in drywall and joint compounds of the walls according to the latest asbestos reassessment. Appropriate security clearances and an escort will be required.Please note that the study recommends option 3, however. The current assumption is that this project will proceed with the scope described above. 1080378 The intent of the project is to complete necessary repairs to the building envelope of MTO 9 Bay equipment storage (B14923) as recommended in Building Envelope Study (Project #1064907). The scope is to replace approximately 30 sq.m (323 sq.ft) of spalled and damaged bricks on the columns at the south elevation of the 9 bay equipment storage building. The project is to be bundled with Envelope Repairs at MTO 6 Bay Patrol Garage Project #1080260.The project shall be in compliance with the latest IO Design and Commissioning Guidelines. The consultant shall produce specifications for the proposed repairs; prepare tendering package, carry out onsite QA, work inspection, provide closeout, warranty & inspection documents. Contractor is required to provide a timeline for the system installation, which shall be approved by the client, as not to interrupt Ministry programs. A project specific DSS will be required as presumed asbestos in the caulking according to the latest asbestos reassessment. Appropriate security clearances and an escort will be required. Replacement of spalled and damaged bricks in the 9-Bay garage should only include the south elevation as described above.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.