Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 23, 2023

May 8, 2023

April 2, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$8,422,222.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Pittsburgh, PA

Subscribe to View Full Documents

The description and location of the project is as follows: For the milling, resurfacing, shoulder repair, base repair, drainage, guide rail, pavement marking, and other miscellaneous construction, all within a length of 36,650.00 linear feet (6.941 miles) as indicated on the approved drawings included in the bid package for Group Project 111-23-7135-3 in Allegheny County, Marshall, Pine & Richland Townships, Commonwealth of Pennsylvania. This project being situated as follows: SR 0910, Section A50 (Wexford Bayne Road-Gibsonia Road) - From a point approximately 700 feet west of the SR 910/Mingo Road intersection at Segment 0010/0011 Offset 0655/0655 (Station 15+00.00) to a point approximately 200 feet east of the SR 910/Hardt Road intersection at Segment 0160 Offset 0175 (Station 383+50.00). Various State Routes and Facilities throughout Allegheny County for unforeseen repair and/or resurfacing, as directed. Project Cost Range: $5,000,000.00 - $7,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays 408 Version: 2020-5 PennDOT - GRP 111-23-7135-3 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Anticipated NTP: 05/08/2023 Required Completion: 04/02/2025

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.