Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
March 13, 2023
April 12, 2023
No Information to Display
Multiple Locations
Renovation
No Information to Display
$36,348.00
Public - County
Multiple Locations, Chesterfield, MO
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Parkway School District is seeking bids from qualified vendors for a complete, turn-key purchase and installation of an Audio/Visual Sound System for West Middle Gym. Questions Due Date: Mar 8th 2023, 12:00 PM CST Contractor shall provide, install, and configure a turn-key gymnasium audio & video projection system. 2. The Contractor shall provide, install, program, and configure all system components. The owner reserves the right to have access for all programs, codes and DSP products. 3. The contractor will build the audio rack with new updated digital equipment. 4. The contractor will provide additional microphone inputs on the far side of the gym for performance with 16 additional inputs. 5. The Contractor will supply a lift for use during installation. Please include in your bids. 6. All 120-volt power will be installed by the owner. Contractor will ID power locations and schedule with Small Projects Supervisor for installation. 7. All 120V and AV cabling must be installed in a factory or field painted white raceway. a. Vertical cable routes may be installed in either EMT conduit or surface raceway systems such as (but not limited to) Wire mold or Panduit. b. Horizontal cable routes must be installed in EMT conduit. Covering all inputs with locking cover plates. 8. The power cord for the projector can be assumed to be a standard grounded NEMA 5-15P style plug. Anything needing to be hard-wired shall be called out in the bid and coordinated with the owner. 9. All work must be coordinated with the District's Small Projects Supervisor and Foreman. 10. The contractor is responsible for all proper permitting associated with their scope. 11. Substitutions of equal or greater quality and functionality will be considered. All equipment bid must be designed to work together. The District is the sole authority on the determination of "equal or greater" equipment. a. Bidders must include manufacturer and part number information along with specification/cut sheets. Intent to Bid by Mar 13, 2023 1:00 PM CDT.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Chesterfield, MO
Bid Date: Nov 14 2023
Chesterfield, MO
Bid Date: Feb 06 2024
Chesterfield, MO
Bid Date: Sep 24 2024
Chesterfield, MO
Bid Date: Sep 23 2024
Chesterfield, MO
Bid Date: Oct 01 2024
Chesterfield, MO
Bid Date: Oct 01 2024
Chesterfield, MO
Bid Date: Jan 03 2022
Chesterfield, MO
--
Chesterfield, MO
Bid Date: Nov 07 2023
Chesterfield, MO
Bid Date: Nov 06 2023
Chesterfield, MO
Bid Date: Oct 05 2023
Chesterfield, MO
Bid Date: Oct 26 2023
Chesterfield, MO
Bid Date: Sep 25 2023
Chesterfield, MO
Bid Date: Oct 24 2023
Chesterfield, MO
Bid Date: Nov 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
