Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 28, 2023

May 8, 2023

June 1, 2025

To Be Determined

New Construction, Site Work

No Information to Display

$55,000,000.00

Public - County

img_map_placeholder

To Be Determined, Midlothian, VA

Subscribe to View Full Documents

IFB Documents can be downloaded and submitted in accordance with the submission and receipt of bids section of this solicitation. Electronic submissions for this solicitation will not be considered. Construction of a new three (3) story middle school building totaling approximately 250,000 square feet including site development, mechanical, electrical, plumbing, fire protection, interior build-out, and finishes. Only complete sets will be issued. Bid documents may also be ordered in hardcopy form from a Printing Contractor at the Bidder's choosing and at the Bidder's cost. The drawings and Invitation for Bid Documents are protected by the common copyright laws of the United States of America. No permission to copy or reproduce these documents in any way or any form whatsoever is granted without the express written permission of the Owner/Architect. Electronic Documents: Project documents (Invitation for Bids, Project Manuals, Drawings, and any other applicable documents) provided electronically are solely for use by the Bidder for the convenience of preparing a bid response for the project. Electronic documents shall not be altered, and shall not be reproduced for any purpose other than the express purpose stated above. Any conclusion or information obtained or derived from such electronic files will be at the Bidder's risk. If there is a discrepancy between the electronic files and the hard copies on file with the County, the hard copies govern. If CAD files are available, the County does not release, nor authorize its engineering and design consultants to release them prior to execution of the Notice to Proceed. Any changes or supplemental instructions to this Invitation for Bid shall be in the form of written addenda. Addenda will be made available on-line via portal To download Addenda, use the same login procedure as described in Supplemental Bidding Instruction item C.1 above. Each bidder is solely responsible for obtaining all addenda. Bidders shall acknowledge receipt of all addenda in the space provided on the Bid Form or by returning a copy of each signed addendum. Failure to do so may result in rejection of the bid. All addenda issued shall become part of the IFB and any resulting contract documents. Construction of a new three (3) story middle school building totaling approximately 250,000 square feet including site development, mechanical, electrical, plumbing, fire protection, interior build-out, and finishes If you have any questions, please contact: Tyler Tingler 9901 Lori Rd Room 303 Chesterfield VA, 23832 United States Tel: 8047176311 Fax: 8047176378 tinglert@chesterfield.gov

30 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.