Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 14, 2023

November 4, 2024

November 15, 2030

Multiple Locations

Demolition, New Construction, Paving, Site Work

No Information to Display

$230,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Cincinnati, OH

Subscribe to View Full Documents

*As of October 12, 2023, the project, which is a progressive design build project, is still in the design development phase. The next phase, which is the physical construction itself, does not have a firm timeline yet, but is estimated to start at least after a year from now. Brent Spence Bridge Corridor Solicitation : 233000 PID : 116649 Proposal no: HAM116649 A portion of the Work conducted in conjunction with the Project will include the rehabilitation and reconfiguration of the existing Brent Spence Bridge, reducing the number of lanes on each deck from four lanes to three lanes and significantly increasing the inside and outside shoulder widths Design-Build Contractor Notice to Proceed (NTP) : July 15, 2023 Completion of the Contract Deadline : November 1, 2030 Collector-Distributor (CD) Road systems will be constructed with the Project; one CD Road to connect I-71/I-75 traffic to and from the local street network between West 12th Street (southbound at 5th Street) in Covington, Kentucky and Ezzard Charles Drive in Cincinnati, Ohio, and one CD Road between south of Dixie Highway and north of Kyles Lane in both directions Should a question arise at any time during any portion of the Procurement Process, the Offeror may seek clarification by submitting a clarification question using the Departments Pre-Bid website (referencing Project Number 233000) The DBE goal for Phase 1 (Preconstruction Phase including Sub-Phase 1A and Sub-Phase 1B) is 9% of the Sub-Phase 1A and Sub-Phase 1B Contract Price. The Department is targeting a DBE goal of at least 7% of the Contract Price for Phase 2. The DBE goal for Phase 2 will be agreed upon between the Contractor and the Department and finalized by the Department as part of the Phase 2 Change Order.

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.