Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

November 16, 2023

February 14, 2024

301 Troy Dr

Renovation

No Information to Display

$381,003.00

Public - State/Provincial

img_map_placeholder

301 Troy Dr, Madison, WI

Subscribe to View Full Documents

Concrete Stair Repairs 5 Buildings 3, 10, 11 & Administration 6 Mendota Mental Health Institute All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. In general, the work consists of: reconstruction of the exterior concrete stairs, sidewalks and railings at buildings 3, 10, 11 and the administration building and reconstruction of the pedestrian bridge at the administration building. It will include items such as removals, base aggregate dense, concrete steps, curb and gutter and sidewalk, concrete masonry bridges, pipe railing and asphaltic surface. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. CONSTRUCTION OF NEW STAIRS AND SIDEWALK NEAR BUILDINGS 3, 10, 11, AND 175. AS WELL AS A NEW PEDESTRIAN BRIDGE JUST EAST OF THE ADMINISTRATION BUILDING.

30 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects