Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 20, 2023

May 17, 2023

November 29, 2023

Burrough Valley Rd

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Burrough Valley Rd, Tollhouse, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The work to be done consists, in general, of the replacement of the Dry Creek Bridge and box culvert on Burrough Valley Road, south of the community of Tollhouse and approximately 25 miles northeast of the City of Fresno. The existing bridge would be removed to accommodate a replacement structure measuring 35 feet 6 inches wide by 114 feet long; the replacement structure would accommodate two 12-foot-wide traffic lanes, two 4-foot-wide shoulders, and two Type 836 concrete barriers. The replacement culvert would consist of a two cell 6-foot high (4-foot clear) by 12-foot wide (12-foot clear) precast concrete box culvert structure. During construction, traffic on Burrough Valley Road would be maintained through the construction of a temporary creek crossing downstream of the existing bridge. The crossing would be located approximately 110 feet south of the southwestern corner of the existing bridge span, connecting Tollhouse Road to Burrough Valley Road. Deadline for questions will be extended to no later than 2:00 P.M. on the seventh (7th) calendar day before the revised bid opening date. Questions shall be submitted on the "Request for Clarification Form" provided on our website. The DBE Contract Goal is 22 percent. Bid security in the amount of ten (10) percent of the amount of the bid, and in the form of a bid bond issued by an admitted surety insurer licensed by the California Department of Insurance, cash, cashier's check or certified check shall accompany the bid. The engineer's estimate range is $4,884,000 to $5,399,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.