Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 1, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$2,426,599.00

Public - City

img_map_placeholder

Multiple Locations, Garner, NC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of August 17, 2023, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, it is anticipated bidding will commence in spring 2024, with construction following. *The closed solicitation has been included below for reference: The Town of Garner desires to engage a private engineering consulting firm to provide Construction Engineering and Inspection (CEI) and Construction Contract Administration services for TIP Project U-6225 White Oak, Hebron Church, Ackerman Roundabout. Town of Garner construction project with an anticipated start date in Fall 2023, and approximately 9 months of construction. The selected firm will report directly to the TOWN OF GARNER, ENGINEERING DEPARTMENT. All submissions, correspondence, and questions concerning this RFLOI should be directed to Lisa Rodriguez at (919) 890-7310 or by email at erodriguez@garnernc.gov. IF APPLICABLE, questions may be submitted electronically only, to the contact above. Responses will be issued in the form of an addendum available to all interested parties. Interested parties should also send a request, by email only, to the person listed above to be placed on a public correspondence list to ensure future updates regarding the RFLOI or other project information can be conveyed. Questions must be submitted to the person listed above no later than March 7, 2023 The last addendum will be issued no later than March 10, 2023 PROPOSED CONTRACT TIME: 270 CALENDAR DAYS Anticipated Notice to Proceed - Fall 2023 The Method of Contractor Selection has not been Determined at this time

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.