Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 29, 2023

May 1, 2023

October 15, 2023

Multiple Locations

Outdoor Lighting, Site Work

No Information to Display

$25,003,220.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Fort Assiniboine, AB

Subscribe to View Full Documents

Selective Grading, Selective Sideslope Improvement, Culvert Replacement, Granular Base Course, Cold Milling, Cold In-Place Recycling, Asphalt Concrete Pavement, Gravel Surfacing, Street Light Installation and Other Work 33:08 Hwy 18 to S. of Fort Assiniboine kilometre 0.000 to 34.473 33:08 Intersection Improvements at Various Locations Selective Grading, Culvert Replacement, Granular Base Course, Cold Milling, Asphalt Concrete Pavement, Street Light Installation and Other Work 661:02 Hwy 33 to 19 km W. of Hwy 769 kilometre 0.000 to 23.44 661:02 Intersection Improvement at Hwy 33 North Central Region APPROXIMATE QUANTITIES: 6 signs Construction Advertising Sign 181 140 tonne Supply of Aggregate - With Option 76 900 cubic metres Common Excavation 3 400 cubic metres Borrow Excavation - Contractor Supplied 10 accesses Access Removal 2 km Sideslope Improvement - Partial for HTCB 458 metres Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 602 metres Culverts - Supply and Install (600 mm dia. C.S.P.) 430 metres Smooth Wall Steel Pipe - Supply and Install (750 mm dia.) 4 000 square metres Separation/Filtration Geotextile - Supply and install (Class B) 35 600 tonne Granular Base Course Des. 2 Class 25 872 tonne Gravel Surfacing Des. 4 Class 25 75 870 square metres Cold Milling Asphalt Pavement - 60 mm Depth 99 100 tonne Asphalt Concrete Pavement - EPS- Mix Type M1 (PG 58-28) 97 signs Removal and Reinstallation or Disposal of Existing Sign Assembly - One Post 17 messages Durable Pavement Message - Stop Bar 56.92 km Roadway Lines - Supping Paint and Painting (Directional Dividing and 2 Edge Lines) 1 730 metres Removal and Disposal of Existing Guardrail 700 metres Strong Post W-Beam Guardrail - Supply and Install 2 520 metres High Tension Cable Barrier (TL-3, design dynamic deflection 2.45 m) - Supply and Install 29 km Milled Rumble Strip - Centreline 2 980 metres Secondary Cable - Supply and Install - 2c#8 Cu TECK 22 units Street Light Standard - Supply and Install (13.1 m davit, Type 2 - 19,000 lm Luminaire) 2 units Distribution Enclosure - Supply and Install Contractor to supply all materials. Documents can be obtained from www.purchasingconnection.ca. *Award granted

123 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.