Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 18, 2023

October 10, 2023

December 13, 2024

Multiple Locations

Demolition, New Construction, Paving, Site Work

No Information to Display

$2,852,082.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Arlington, VT

Subscribe to View Full Documents

Arlington VTRY(25) : VTR Bridge No. 62 Over Warm Brook at Mile Post 14.72 in Arlington. Manchester VTRY(26) : VTR Bridge No. 67 Over Lye Brook at Mile Post 20.96 Shaftsbury VTRY(22) : VTR Bridge 58.5 - Over Paran Creek, Mile Post 3.45 Type of Construction: Arlington VTRY(25) (Re-ad) - Install Lateral Braces on the Top Flanges of Stringers. Install Cover Plates on Interior Floor Beams. Replace South Abutment Bearing Seat and Pedestals With Cast-in-place Concrete, and Clean and Reset Bearings. Manchester VTRY(26) (Re-ad) - Rehabilitate Superstructure With Web and Flange Plates, Replace Timber Pedestals With Cast-in-place Concrete Pedestals and Replace Bearing With Elastomeric Bearing Pads. Shaftsbury VTRY(22) (Re-ad) - Removal and Replacement of Existing Superstructure With Open Deck Steel Deck Plate Girder Structure, Remove and Replace Bridge Backwall and Bearings, Channel Work and Associated Track Work. Contract Completion Date: This Contract Shall Be Completed on or Before November 15, 2024. Electronic Bid Bond to Be Submitted in the Amount of 5% of the Contractor's Bid. Estimate is Category D : $1,000,000 - $2,500,000 During the Advertisement Period, All Questions Shall Be Addressed Solely to the Office of Contract Administration via Email: Aot.constructioncontractinginquiry@vermont.gov. All Inquiries Must Be Received by 4:30pm on Wednesday, June 28, 2023. Vtrans Hereby Notifies All Bidders That It Will Insure That in Any Contract Entered Into Pursuant to This Advertisement, Minority Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Sex, Or National Origin in Consideration for an Award. The Right is Reserved to Reject Any or All Bids, to Waive Any Formality, and Any and All Technicalities in Bids, and to Accept Such Bids as May Be Deemed in the Best Interest of the Awarding Agency *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. VTDOT - Arlington VTRY(25) & Manchester VTRY(26) & Shaftsbury VTRY(22) Question and Answer Addendum Date is expected July 5th , 2023 Project Overview a. Updates from previous bid Package o Added options to avoid the use of small quantities of rapid-set-concrete and improve availability where used. Precast pedestal option Repair and grout material options Working with suppliers to get mixes approved b. Shaftsbury VTRY (22) overview and highlights c. Arlington VTRY (25) overview and highlights d. Manchester VTRY (26) overview and highlights

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.