Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 17, 2023

May 16, 2023

July 3, 2024

Illini Dr & Hiawatha Dr

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Illini Dr & Hiawatha Dr, Carol Stream, IL

Subscribe to View Full Documents

L-93,742 Site Directions: Klein Creek between Mitchell Lakes and Illini Drive. Northwest of the intersection between Illini Drive & Hiawatha Drive, approximately 0.5 mile west of DuPage County Highway 23 (Gary Avenue). Question Deadline 03/08/2023 Bidder shall advise the Director of Engineering Services, via e-mail at engineeringservices@carolstream.org, no later than five (5) working days prior to the date for Delivery of Bids. Any questions received after such time shall be answered at the sole discretion of the Village. Online Bidding: Available Pre-Qualification: Yes Description: The Village of Carol Stream, Illinois will receive Sealed Bids for a Public Works Construction contract that will restore and stabilize the eroded streambanks of approximately 1,700 linear feet of stream channel and 400 linear feet of pond shoreline, reconstruct the outfall of an on-line retention pond (i.e. Mitchell Lakes), and convert an asphalt parking lot to permeable pavers. A general description of the work involved is streambank excavation and re-shaping, including re-meandering to create new channel and "oxbow" areas, as well as constructing wetland areas. The stabilization measures to be installed include vegetated rock toe, in-stream rock substrate areas, stream barbs, and pre-cast modular retaining walls. The work will also involve tree removal, adjusting storm sewers, installing pre-cast culverts, planting native vegetation, and performing maintenance and monitoring during establishment. An in-stream work plan will be required that addresses dewatering operations in order to construct "in the dry".

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects