Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 9, 2023

September 4, 2023

No Information to Display

100 Old Farms Rd

Site Work

No Information to Display

$1,993,000.00

Public - City

img_map_placeholder

100 Old Farms Rd, West Simsbury, CT

Subscribe to View Full Documents

**As of March 24,2023 bids were canceled. No definite date for the rebid.** A. The Contractor shall install an underground irrigation system in accordance with the accompanying plans and Specifications. The work shall include all labor, construction equipment, and materials necessary to satisfactorily complete installation of the fully functional irrigation system. The Contractor shall comply with manufacturer's and irrigation engineers recommendations for installing pipe, valves, sprinklers and all equipment of a permanently fixed nature so that installation completely conforms to requirements of sprinkler outlet spacing and locations as shown on the plan. Contractor is to locate all sprinkler outlets to within one (1) foot of the location staked by Engineer. If at any time it is found that the Contractor has failed to satisfy the plans and specifications, he shall be required to correct same at his own cost. B. The omission of any material from this Specification is not to be interpreted to the effect that omitted material will not be furnished by the Contractor. The Contractor under this contract, unless specifically indicated as being furnished by others, must furnish all materials and labor. Where there is a discrepancy between the specifications and the drawings, the specifications are to prevail. C. The Contract consists of furnishing and installing all materials required for the installation of the automatic irrigation system for the project as delineated on the plans. All materials for the irrigation system are to be purchased from the distributor providing the irrigation components of the system. This project includes the supplying and installing a new automatic irrigation system at Simsbury Farms Golf Course. Question Deadline- 03/02/2023

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.