Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 18, 2024

March 18, 2024

March 18, 2025

Douglas Rd W

Paving, Site Work

No Information to Display

$3,690,000.00

Public - City

img_map_placeholder

Douglas Rd W, Oldsmar, FL

276

8

4

5

Subscribe to View Full Documents

A detailed scope has not yet been determined. As of March 2, 2023, this project is included in the City of Oldsmar FY 2022-2027 Budget CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Question Deadline, December 19, 2023, at 5:00pm EST Questions regarding this bid should be submitted in writing to purchasing@myoldsmar.com Work includes Closing in the existing large ditches on Douglas Road between Commerce Boulevard and Race Track Road with concrete pipe and widening the roadway with a continuous turn lane. Repaving of existing roadway, new sidewalk, bus stop improvements, and utility relocations. Section 4.02 PRICING / PERIOD OF AGREEMENT A. Unit prices bid of listed items shall be held firm for the duration of the Agreement. Duration of the Agreement shall be to commence Work under this Agreement with an adequate force and equipment on or before a date specified on the Notice to Proceed, and to fully complete all necessary work within three hundred and sixty-five (365) consecutive calendar days. B. Bidders shall note that the Owner's construction schedule is subject to availability of City funds. The Owner will be the sole determiner of the sequence of construction and may, at its option, elect to have the construction performed in parts by way of Work Orders as City funds allow. The Owner may decide to have Contractor do all of the work shown or select only a portion based on availability of City funds.

42 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.