Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2023

October 20, 2023

No Information to Display

516 S 10th St

Renovation

No Information to Display

$2,070,250.00

Public - City

img_map_placeholder

516 S 10th St, Fernandina Beach, FL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Specification questions during the submittal period must be submitted in writing to Wanda Weaks, Purchasing Agent, at wweaks@fbfl.org. SCOPE OF WORK The Contractor shall supply all labor, equipment, and materials necessary to perform the work under this contract. The work consists of all installation of flooring in the form of 2-1/4"x3/4" river recovered, clear heart pine through auditorium, hallways, foyers, stairs and common areas. Wood grain should be a mix of select and vertical. All work will be performed in accordance with the specifications provided by the City of Fernandina Beach. 1. Obtain all local permits as required. 2. Setup safety in accordance with OSHA standards. 3. Remove all base boards and quarter round moldings. 4. Remove approximately 6,000 sq ft of existing flooring to the subfloor. The existing flooring is a mix of heart pine (auditorium room), tile (2 sets of stairs), and heart pine covered with ceramic tile, which is also covered with a floating laminate (in hallways and common areas). 5. Repair and level subfloor as needed. 6. Install 2 - 1/4"x ¾"river recovered, clear heart pine through auditorium, hallways, foyers, stairs, and common areas. Wood grain should be a mix of select and vertical. 7. New heart pine must be sanded and finished with 3 coats of polyurethane 8. Reinstall baseboards and moldings. Repair and replace baseboards and moldings as necessary and paint to match existing. 9. Flooring installation to come with 1-yr labor warranty 10. City will provide staging area for dumpster, materials, equipment, and parking for workers. The City reserves the right to accept or reject any or all Bids, to waive irregularities and technicalities, and to request resubmission or to re-advertise for the services

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects