Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 16, 2023

April 17, 2023

September 14, 2023

To Be Determined

Renovation

No Information to Display

$145,911.00

Public - County

img_map_placeholder

To Be Determined, Lebanon, OH

Subscribe to View Full Documents

Questions regarding the technical specifications should be in writing and directed to Kathryn Gilbert at the Warren County Water and Sewer Department, Kathryn.Gilbert@co.warren.oh.us, (513) 695-1645. To be given consideration all questions must be received by 4:00 pm on Thursday, March 9, 2023. The project generally consists of demolition of the 150,000-gallon Corwin ground storage tank, piping modifications within the Corwin Booster Pump Station, site piping demolition, and sitework. (has non-vertical building use.) Powell in the Commissioners' Office at krystal.powell@co.warren.oh.us with your contact information. The Board of Warren County Commissioners reserve the right to accept the lowest and best bid, to reject all bids, and to waive any irregularities in bids. The estimated contract value is $135,000.00. The work for this contract is located in Wayne Township, Warren County, Ohio and consists of the following: 1. Demolition of the 150,000 gallon Corwin Ground Storage Tank and site piping. 2. Piping modifications within the Corwin Booster Pump Station. 3. Relocation of communication antenna to a new 30 foot communications pole. 4. Regrade, seed, and straw all disturbed areas including aeras under existing storage tank and valve vault to match surrounding areas. Substantial Completion: 120 Days from Notice to Proceed. Final Completion: 150 Days from Notice to Proceed

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.