Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 11, 2023

February 26, 2024

NE Baker Hill Rd & Lynwood Center Rd NE

Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

NE Baker Hill Rd & Lynwood Center Rd NE, Bainbridge Island, WA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Notice is hereby given that Public Utility District No. 1 of Kitsap County (KPUD) will receive sealed bid proposals for the South Bainbridge Well 10 Iron and Manganese Removal Project Bids are being asked for provision of all necessary labor, equipment, materials and appurtenances required to construct new iron and manganese removal treatment plant facilities onsite, including a 12 feet by 30 feet CMU building enclosure, iron and manganese ATEC filter package prepurchased by KPUD, piping, valves, instrumentation and appurtenances associated with but not furnished as part of the packaged treatment system, sodium hypochlorite feed system, potassium permanganate feed system, backwash recycle tank and associated pump, yard and process piping, instrumentation and appurtenances, associated sitework and landscaping, and other work as shown on the project plans and specifications. The project is located in the City of Bainbridge Island, WA. The new treatment system will be constructed within KPUD's easement on parcel 042402-1-054-2005, upon which a well, booster pump station, and an aboveground reservoir are located on Bainbridge Island in the NE 1/4 of the NE 1/4 of Section 4, Township 24 North, Range 02 East at approximately Latitude 4736'23.5" N and Longitude 12232'40.09" W. The time for completion on this project is 120 working days. Point of contact is Bill Whiteley, P.E., at (360) 626-7747. Each Bid Proposal shall conform to the requirements of Section 1-02.9 of the Contract Special Provisions. Bids shall be made out on the bid form furnished with the specifications. A 5% bid guarantee is required in the form of certified or cashier's check, or surety bond in accordance with the contract specifications. Contractor must be licensed to conduct business in the State of Washington. The contract will be awarded to the qualified bidder submitting the lowest responsible bid. KPUD reserves the right to reject any or all bids and to waive all informalities in the bidding in accordance with the specifications. All work performed on this project will be subject to the higher of the prevailing state or federal wage rates. KPUD is an Equal Opportunity and Affirmative Action Employer. This project is partially funded through the Washington State Drinking Water State Revolving Fund (DWSRF) program with federal funds from the Environmental Protection Agency; general contractors and all subcontractors must meet DWSRF requirements and provisions. Small, Minority- and Women-owned firms are encouraged to submit bids.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.