Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

October 16, 2023

No Information to Display

E 200 S

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

E 200 S, American Fork, UT

Our team is requesting plans for this project.

Subscribe to View Full Documents

Construct 200 South multi-modal roadway improvements from 270 West to 570 West Road (approximately 0.42 miles). Demolition work includes; demolition of existing asphalt pavement, concrete, utilities, and street signs, etc. New Construction work includes construction/installation of; asphalt pavement, concrete curb and gutter, concrete sidewalk, traffic signage, roadway striping, chain link fencing, storm drain pipe (12” RCP, 24”), storm drain manholes, culinary water pipe (6” PVC, 8” PVC), new fire hydrants, secondary water pipe (1” Service, 1½” Service, 2” Service, 4” PVC, 6” PVC, 8” PVC, 12” PVC) and meters, adjust sanitary sewer manholes, fiber optic utility equipment, and all appurtenances. The Work features a railroad crossing which will require flagging and coordination. Question Submission Close Date 8/11/2023 2:00 PM MDT All questions about the meaning or intent of the Bid Documents are to be submitted on SciQuest. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda and posted on SciQuest. Questions received less than five working days prior to the date for opening of Bids may not be answered. Unless otherwise provided in the Supplementary Conditions, CONTRACTOR shall obtain and pay for all permits, licenses and Inspections Payroll costs shall include salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. American Fork City Reserves the Right to Accept or Reject Any or All Proposals, or Any Part of Any Proposal. American Fork City Reserves The Right to Waive Any Informality in Part or in Whole if It Is Deemed to Be in The Best Interest of American Fork City.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects