Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 17, 2024

March 18, 2024

No Information to Display

To Be Determined

Renovation

No Information to Display

$2,800,000.00

Public - City

img_map_placeholder

To Be Determined, Thousand Oaks, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

The necessary rehabilitation work for the Unit W Project, Phase 1, includes installation of a temporary wastewater bypass pipeline to HCTP headworks so closed circuit television (CCTV) work can be performed on the inside of the wastewater pipelines. This CCTV work will be done on one pipeline at a time. Due to the long pipeline reaches on the Unit W alignment and the equipment limitations of the CCTV equipment (cable length), this project will also install access tee fittings at key locations. The access points will be installed when the flows are transferred to the other existing pipeline. Once the access points are completed and no longer needed on this project, they will be closed and left in place for future use. In addition, three of the existing isolation valves are non-functional due to mechanical failure and will be replaced as part of this project (owner furnished, contractor installed). These valves are buried in the canyon and therefore must be excavated to be replaced. The condition assessment of the existing facilities is the first phase of a potential two-phase project. The Work consists of: 1. Replacements as shown in the Contract Documents of valves, appurtenances, and installation of access manways. 2. Furnishing, installing & maintaining bypass system and tee access to existing pipelines to perform the cleaning & CCTV inspections of the pipelines & structures per the Construction Drawings. 3. Remove, replace, and reconstruct treatment plant access road pavement, where shown on drawings. 4. Coordinate with the city's treatment plant personnel for the operation of their valves, access to the site, and laydown areas. The isolation valves for the project (non-bypass) have been purchased by the City and will be supplied to the Contractor to install as part of this project. Question Submission Deadline: February 22, 2023, 5:00pm

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects