Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 15, 2023

April 1, 2024

No Information to Display

97 Kaulbach St

Site Work

No Information to Display

$100,000.00

Public - City

img_map_placeholder

97 Kaulbach St, Lunenburg, NS

Subscribe to View Full Documents

The intent of this Tender call is to obtain an offer to perform Work to complete the Lunenburg Academy Drain-Tile Foundation Repair Project located as indicated in Contract Documents under Stipulated Price Contract, in accordance with Contract Documents. Perform Work within 2024 construction season Direct questions to Project Engineer Andre Veinotte, telephone (833) 756-8433 or by e-mail at tenders@ableinc.ca . The Work to be completed under this Contract includes (but is not limited to) the following: .1 Excavation and stockpiling of sandy silt material as shown to be reused as backfill. Unsuitable material, if encountered, to be removed offsite. Brick pavers may be reused if suitable. .2 Inspection and repair of damaged existing drain tile and replacement of all solid drain tile pipe with perforated drain tile pipe around the perimeter of the Lunenburg Academy foundation as indicated on the drawings. .3 Work pertaining to downspout inspection and testing as shown in the project documents. Repair work identified to be completed on a time and material basis via change order. Contractor to include allowance in Budget for the performance of this work. .4 Repairing of the existing masonry stone foundation wall with appropriate mortar for heritage stone as directed by the Engineer's representative. Work is to be completed with no more than 5 metres of stone masonry wall exposed at a time to preserve wall integrity. .5 Apply waterproofing, insulation, and fibreboard around the perimeter of the Lunenburg Academy foundation as indicated on the drawings. .6 Repairing of the existing exposed brick foundation wall: including but not limited to: removal of paint with low-pressure water, peeling strips, or chemical paint strippers as determined by the Contractor and consultant based on type of paint, repointing of open and cracked joints with lime mortar mix, replacement of damaged brick units, removal and filling of staging support plugs with lime mortar mix, repairing and repointing of open joints at the stone bands with lime mortar mix, and all else required to complete the work as indicated on the drawings. .7 Reinstate any disrupted asphalt, brick pavers, walkways, stairs, and landings to original or better state. Documents are available at owner's website: https://townoflunenburg.ca/purchasing.html

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects