Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 11, 2023

No Information to Display

Loewen Blvd

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Loewen Blvd, Steinbach, MB

Our team is requesting plans for this project.

Subscribe to View Full Documents

2023 Lift Station #2 upgrades: Replacement of existing pumps, new control panel, electrical panels, and equipment relocated to a new control room (repurposed existing generator room) and a new generator room addition. TIMELINE: Installation of 390m of 350mm force main, from Lift Station #2 to the wastewater sewer manhole at the Loewen Boulevard and Home Street intersection can now be followed under a separate report, tender delayed until late 2023/early 2024. Project design is nearing completion for the building upgrades. Tender to be issued shortly.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.