Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 1, 2023

July 31, 2024

500 2 St E

Renovation

No Information to Display

$250,000.00

Public - City

img_map_placeholder

500 2 St E, Kindersley, SK

Our team is requesting plans for this project.

Subscribe to View Full Documents

Work includes: New refrigeration system implementation with advanced controls; Integrated heat recovery; Higher insulated doors; LED lighting; Pool heating integration; and Walking track air conditioning. TIMELINE: Request for Proposals from engineering services is underway. Construction is planned for 2023. Project schedules may be confirmed in spring 2023. *Budget is unreleased.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects